-
Blue Moon, The Elmet Group, and EQ Resources Announce a US$150-$175 Million Investment into the Springer Tungsten Complex, Nevada, to Strengthen the U.S. Tungsten Supply Chain
Blue Moon Metals Inc. (“Blue Moon” or the “Company”) (TSXV: MOON; NASDAQ: BMM) – https://www.commodity-tv.com/ondemand/companies/profil/blue-moon-metals-inc/ -, along with The Elmet Group Co. (“Elmet” or “TEG”) (NASDAQ: ELMT), and EQ Resources Limited (“EQ”) (ASX: EQR) (together the “Parties” or “Party”), are pleased to announce signing a binding letter agreement dated September 11, 2026 regarding a series of strategic transactions intended to unlock the value of Blue Moon’s Springer Tungsten Complex (“Springer”), located in Imlay, Nevada. Springer historically was one of the largest tungsten mines in the United States, and consisting of open pit and underground mines, a 1,200 Tpd mill and an Ammonium Paratungstate (“APT”) plant capable of potentially producing up…
-
Blue Moon, die Elmet Group und EQ Resources geben eine Investition in Höhe von 150 bis 175 Millionen US-Dollar in den Springer-Wolfram-Komplex in Nevada bekannt, um die US-amerikanische Wolfram-Lieferkette zu stärken
Blue Moon Metals Inc. („Blue Moon“ oder das „Unternehmen“) (TSXV: MOON; NASDAQ: BMM) – https://www.commodity-tv.com/ondemand/companies/profil/blue-moon-metals-inc/ –, zusammen mit The Elmet Group Co. („Elmet“ oder „TEG“) (NASDAQ: ELMT) und EQ Resources Limited („EQ“) (ASX: EQR) (zusammen die „Parteien“ oder „Partei“) die Unterzeichnung einer verbindlichen Absichtserklärung vom 11. September 2026 bezüglich einer Reihe strategischer Transaktionen bekannt zu geben, die darauf abzielen, das Wertpotenzial des Springer-Wolframkomplexes („Springer“) von Blue Moon in Imlay, Nevada, zu erschließen. Springer war in der Vergangenheit eines der größten Wolframminen in den Vereinigten Staaten und besteht aus Tagebau- und Untertagebaubetrieben, einer Aufbereitungsanlage mit einer Kapazität von 1.200 Tonnen pro Tag sowie einer Ammoniumparatungstat („APT“)-Anlage, die potenziell bis zu 4.000…
-
Amex Gold Mining erweitert sein Projekt um neue Gold-Zone!
Anzeige – Dieser Beitrag wird im Auftrag von Amex Gold Mining Inc. veröffentlicht! · Entgeltliche Beziehung: Die SRC swiss resource capital AG unterhält mit Amex Gold einen entgeltlichen Investor-Relations-Beratungsvertrag · Erstellt von: JS Research GmbH, Olsberg · Autor: Jörg Schulte (Geschäftsführer, JS Research GmbH) · Vergütung durch SRC · Erstveröffentlichung: 14. September 2026, 5:30 Uhr Europa/Berlin · +++ Gold weiterhin auf hohem Niveau! Niedrige Kosten werden belohnt! +++ Der Goldmarkt liefert weiterhin ein konstruktives Umfeld, auch wenn kurzfristige Schwankungen zum Bild gehören. Als Belastungsfaktoren wurden höhere US-Erzeugerpreise und veränderte Zinserwartungen identifiziert. Für Produzenten und fortgeschrittene Entwickler zählt aber nicht nur der Tagespreis allein, sondern vor allem die Kostenposition und Umsetzbarkeit…
-
Wochenrückblick KW 37-2026! Das Geld wird wieder teurer!
Die Botschaft dieser Börsenwoche ist klar: Das Geld wird wieder teurer. Steigende Energiepreise, anziehende Inflation und hohe Anleiherenditen zwingen die Notenbanken zurück in den Kampfmodus. Die EZB erhöhte ihren Leitzins um 25 Basispunkte auf 2,50 %, und nach den jüngsten US-Inflationsdaten spricht vieles dafür, dass die Federal Reserve kommende Woche nachzieht. Bemerkenswert bleibt, wie widerstandsfähig die Aktienmärkte reagieren. Trotz wachsender Zinssorgen kam keine Panik auf – ein Zeichen dafür, dass ein Teil der geldpolitischen Straffung bereits eingepreist ist. Öl bringt die Inflationsgefahr zurück! Der größte externe Belastungsfaktor bleibt der Nahe Osten. Die anhaltenden Spannungen und Störungen wichtiger Transportwege trieben die Ölpreise wieder über 100,- USD je Barrel. Brent erreichte im…
-
Newcore Gold verbindet ‚PFS‘-Basis mit neuem Explorationspotenzial!
Anzeige – Dieser Beitrag wird im Auftrag von Newcore Gold Ltd. veröffentlicht! · Entgeltliche Beziehung: Die SRC swiss resource capital AG unterhält mit Newcore Gold einen entgeltlichen Investor-Relations-Beratungsvertrag · Erstellt von: JS Research GmbH, Olsberg · Autor: Jörg Schulte (Geschäftsführer, JS Research GmbH) · Vergütung durch SRC · Erstveröffentlichung: 12. September 2026, 8:30 Uhr Europa/Berlin · Am 9. September 2026 notierte Gold zeitweise bei rund 4.450,- US-Dollar je Unze. Damit lag der Marktpreis über dem in der ‚Pre-Feasibility Study‘ (‚PFS‘) von Newcore Gold Ltd. (WKN: A2QATA) verwendeten Basispreis von 3.800,- US-Dollar. Dies verbessert grundsätzlich das Umfeld für diesen Goldentwickler. Die strukturelle Nachfrage bleibt ein wichtiger Faktor. In einer 2026 veröffentlichten…
-
Silver Tiger Intersects 2.1 Metres of 7.72 Kilograms per Tonne Silver Equivalent in the Caleigh Vein Including 0.53 Metres of 29.62 Kilograms
Silver Tiger Metals Inc. (TSX:SLVR and OTCQX:SLVTF) ("Silver Tiger" or the “Corporation”) – https://www.commodity-tv.com/ondemand/companies/profil/silver-tiger-metals-inc/ – is pleased to announce exploration results for the 2026 Summer Program on the Northern Area of its 100% owned, silver-gold El Tigre Project located in Sonora, Mexico. In addition, this release details the confirmatory, high-grade assay results from the 2025 geotechnical drilling campaign from inside the El Tigre heap leach mine which is being built. Northern Veins and Stockwork Zone Highlighted Intersections New high-grade epithermal vein intersections of the Caleigh and Protectora Veins and the newly discovered Northern Stockwork Zone (identical to the El Tigre Stockwork Zone) are highlighted below: Drill hole ET-24-649: 1…
-
Silver Tiger stößt in der Caleigh-Ader auf einen 2,1 Meter langen Abschnitt mit 7,72 Kilogramm Silberäquivalent pro Tonne, darunter 0,53 Meter mit 29,62 Kilogramm
Silver Tiger Metals Inc. (TSX:SLVR und OTCQX:SLVTF) („Silver Tiger“ oder das „Unternehmen“) – https://www.commodity-tv.com/ondemand/companies/profil/silver-tiger-metals-inc/ – freut sich, die Explorationsergebnisse des Sommerprogramms 2026 im nördlichen Bereich seines zu 100 % unternehmenseigenen Silber-Gold-Projekts El Tigre in Sonora, Mexiko, bekannt zu geben. Darüber hinaus enthält diese Pressemitteilung detaillierte Informationen zu den bestätigenden, hochgradigen Untersuchungsergebnissen aus der geotechnischen Bohrkampagne 2025 innerhalb der im Bau befindlichen El-Tigre-Hauflaugungsmine. Hervorstechende Durchschneidungen in den nördlichen Adern und der Stockwork-Zone Neue hochgradige epithermale Aderndurchschneidungen der Adern „Caleigh“ und „Protectora“ sowie der neu entdeckten nördlichen Stockwork-Zone (identisch mit der El-Tigre-Stockwork-Zone) sind im Folgenden aufgeführt: Bohrloch ET-24-649: 2,1 Meter mit einem Gehalt von 7.715,1 g/t Silberäquivalent 102,87 g/t Goldäquivalent in der…
-
Baufortschritte, Studienkennzahlen und hochgradige Untertage-Optionen prägen diese Story!
Anzeige/Werbung – Dieser Artikel erscheint im Auftrag von Silver Tiger Metals Inc.! · Bezahlte Beziehung: SRC swiss resource capital AG unterhält einen entgeltlichen IR-Beratervertrag mit Silver Tiger Metals Inc. · Ersteller: JS Research GmbH, Olsberg · Autor: Jörg Schulte (GF JS Research GmbH) · Vergütung durch SRC · Erstveröffentlichung: 11. September 2026, 5:30 Uhr Europa/Berlin · Silber verbindet Investment- und Industrienachfrage. Das Silver Institute World Silver Survey 2026 zufolge dürfte der globale Markt 2026 das sechste Defizitjahr in Folge verzeichnen; erwartet wird eine Lücke von rund 46,3 Mio. Unzen. Für neue Minenprojekte wie das von Silver Tiger Metals (WKN: A2P4YL) ist das Umfeld damit grundsätzlich interessant. Vom genehmigten Projekt zur Mine! Silver Tiger Metals (WKN: A2P4YL)…
-
Hannan Completes IP Survey at Stavaträsk Gold Project, Sweden 1,000 m Drill Program to Test Depth Extensions Next Month
Key Points: Gradient-array IP survey completed at Stavaträsk, the first systematic geophysical coverage of the gold system. Survey acquired on a 200 m grid covering a 3 km2 area with 100 m spaced infill and one dipole-dipole section over key drill area; data are now being processed and interpreted. Follows the Company’s maiden seven-hole drill program (ST2601-ST2607), which returned gold in every hole and highlight intervals of 1.1 m @ 15.6 g/t Au including 0.6 m @ 27.8 g/t Au and 4.6 m at 7.2 g/t Au including 1.9 m at 15.7 g/t Au as announced on August 13th and August 31st, 2026, respectively. Interpreted IP data, integrated with the…
-
Hannan schließt IP-Untersuchung im Goldprojekt Stavaträsk in Schweden ab. 1.000-Meter-Bohrprogramm zur Erprobung der Tiefenausdehnung im nächsten Monat
Wichtige Punkte: IP-Messung mit Gradientenanordnung in Stavaträsk abgeschlossen – die erste systematische geophysikalische Erfassung des Goldsystems. Die Vermessung erfolgte in einem 200-m-Raster, das eine Flächevon 3 km² abdeckt, mit einer Verdichtungsmessung im Abstand von 100 m und einer Dipol-Dipol-Strecke über dem wichtigsten Bohrgebiet; die Daten werden derzeit verarbeitet und ausgewertet. Dies folgt auf das erste Sieben-Loch-Bohrprogramm des Unternehmens (ST2601–ST2607), bei dem in jedem Bohrloch Gold nachgewiesen wurde und das herausragende Abschnitte von 1,1 m mit 15,6 g/t Au, einschließlich 0,6 m mit 27,8 g/t Au sowie 4,6 m mit 7,2 g/t Au, einschließlich 1,9 m mit 15,7 g/t Au, wie am 13. August bzw. am 31. August 2026 bekannt gegeben…